Sharing of Authority in Failure/Emergency Condition for Resilience of Air Traffic Management
Project ID
Project Acronym
SAFECORAM
SESAR Programme
SESAR 1
Call
Project Start
2013
Project Close
2015
Documents
ATM Performance Model based on failure and emergency scenario (D2.2)
Documents
Automation Level Baseline Assumption for the Definition of ATM Scenarios (D1.1)
Documents
Failure Emergency Scenarios (D2.1)
Documents
Study Reference Scenarios (D1.2)